Work in Progress: July 2006 Archives

Half Done

| | Comments (0)

The beaded shawlette is coming along. Two of the three beaded eyelet sections are done. Each section measures a bit over 5 inches (about 13 cm) vertically, so the finished piece should be about 16 inches (40 cm) from neck to point.

Because people (non-knitters) always ask me "How long did that take to make?", I decided to figure out how much knitting time will be required to complete this shawlette.

Thing Three

|

Just a quick post because Youngest Child and I are heading over to Tucson's to catch Mumbo Jumbo Voodoo Combo. The cover is well worth it for the pleasure of seeing my Rosie dance. So, here are a couple of pics of the cotton vest I am designing and knitting for my friend Reva. It is kind of a tumbling blocks pattern, but with just one full repeat done it is a bit hard to see.

Hey.

|

Welcome to my blog. As you can see, there's not much here at the moment, but hopefully it will soon fill up with words and pictures, mostly about knitting. But hey, there is more to life than knitting. Or so I've heard.

Free Pattern!

   The Corrugator

About this Archive

This page is a archive of entries in the Work in Progress category from July 2006.

Work in Progress: November 2006 is the next archive.

Find recent content on the main index or look in the archives to find all content.

email me!

Powered by Movable Type 4.23-en